Eight DJ Sets, Twelve Universes, Zero Manual Intervention
“Sub-15ms latency over sACN meant our 1,200-fixture rig was reacting to music faster than the crowd could consciously register it. That's the standard we needed.”
The Challenge
A 12-hour festival main stage with eight back-to-back DJs, each with a different style and energy curve. Pre-programming bespoke cue sequences for every artist was impractical; real-time manual operation across twelve sACN universes was impossible for a single LD.
The Solution
Deployed CueSync Ultimate on the festival's show control network alongside Pioneer DJ Link. CueSync read PRO DJ LINK directly from the DJ booth — BPM, beat phase, and track energy — and drove all twelve sACN universes in real time. Per-DJ style profiles loaded automatically as each artist took the booth.
The Results
All eight DJ sets ran fully automated over twelve hours. Zero manual lighting calls required during the event. Festival production team adopted CueSync Ultimate as standard kit for the following season.
Ready to automate your stage?
Join the professionals who've eliminated manual lighting intervention entirely.
Start your storyMore stories
Berghain Kantine — Berlin, Germany
Automating a Weekly Club Residency with GrandMA3
“I haven't needed a lighting operator at my residency in six months. CueSync just handles it — every drop, every build, exactly right.”
Read story →TechConf 2026 — London, United Kingdom
Solo Production for 200-Person Corporate Events
“I run production for 200-person events entirely by myself. CueSync handles lighting and Resolume in sync with the presentations — I just call the show.”
Read story →